READ
The narrow proposition, START HERE, the Specification Authority Manifest, Claims / Non-Claims, the Threat Model & Failure Modes, and the Known Limitations.
Intelligence is not authority.
Inspect a bounded SIW claim, its evidence, its known limitations, and the failure conditions we are inviting reviewers to attack.
This is a site review candidate. The portable, runnable external inspection package has not been frozen or published.
The narrow proposition, START HERE, the Specification Authority Manifest, Claims / Non-Claims, the Threat Model & Failure Modes, and the Known Limitations.
The intended inspection flow. No runnable package, download or command exists yet; LIM-020 is a recorded release prerequisite.
Artifact identity, version, status, provenance and SHA-256 already recorded in the accepted FIP record. The package manifest and package hash do not exist yet.
The challenge model and the accepted disposition vocabulary. Submission is not active.
Synthetic fixtures · mock provider only · reproduction is INTERNAL
In accepted R2, authorization of a MergeProposal's INSPECTED → ACCEPTED state transition is committed atomically, with required standing prerequisites checked with zero mutation immediately before the transition commit.
This is authorization only, not merge application.
Governance refuses ADMIT when:
A refusal leaves the store unchanged and asserts no admitted standing.
Listed among the M1D conditional claims. They do not promote CAND-01 or CAND-02 and do not rely on pending remediation as mitigation.
Source-currentness and cross-authority identity are known open defects at these boundaries (below). Implemented does not mean deployed.
Do not read these as capabilities.
Bind-time enforcement at model submission: not implemented.
Merge application is listed under “Not implemented at accepted R2 head” in the accepted Known Limitations Register (see also FIP-H-006).
Universal route closure or non-bypassability is a recorded non-claim.
Generalized consequential execution.
At the accepted baseline, Federation-derived proposals can receive a new ADMIT despite non-current source states because standingCurrentnessPrerequisites are stored but not consumed.
Status: OPEN — CANDIDATE DEFECT. · LIM-010 in the Known Limitations Register
Source revalidation is insufficiently qualified and may satisfy one authority/domain's reference with another authority/domain sharing object identity/version characteristics.
Status: OPEN — CANDIDATE DEFECT. · LIM-011 in the Known Limitations Register
Recorded baseline (Specification Authority Manifest): R2 accepted implementation head: ca596c0. R3 M1A–M1C: accepted. M1D: conditional. Full detail: Threat Model §5 · Known Limitations (LIM-010, LIM-011).
Genesis accepted the milestone. Trust it only within the stated ceiling.
Evidence from a milestone accepted only conditionally (currently M1D).
Specified, not yet proven by implementation.
Published and open until an accepted artifact closes it.
Work exists but is not accepted. It is not relied on.
A rerun within the same team or lineage. Not external and not independent.
Presentation mapping only, using terms from the accepted registers: KNOWN OPEN DEFECT is a KNOWN LIMITATION whose recorded status is OPEN — CANDIDATE DEFECT; NON-CLAIM and OUT OF CURRENT FIP CLAIM SCOPE are shown as neutral chips; UNVERIFIED (RAT-059) uses the pending treatment. No other maturity labels are used.
FIP-001 does not claim:
These are lines from the accepted Claims / Non-Claims Register (terminal punctuation omitted); the full register has more: Non-claims · ceiling: Threat Model §8.
Related recorded limitation — LIM-018 (Gateway proof is mock-level): M1 proofs use MOCK_PROVIDER_A and zero external network attempts.
Blocking one tested route does not prove closure of every materially equivalent route.
A discovered alternate route is an intended inspection result, not something to hide.
We are not asking reviewers to believe Genesis AiX.
We are exposing a bounded claim, the evidence supporting it, the limits on that evidence, and the seams reviewers are invited to attack.
A reproduced failure is evidence.
Intellectual Property notice · Evaluation / Inspection boundary · Licensing · IP & Provenance
The frozen inspection release will carry its applicable inspection/access boundary. This review candidate itself creates no additional license or implementation authority.
Reading this surface does not grant access to controlled material. Identifiers and hashes shown here are metadata only.